LOCATION:HOME > PRODUCTS > LIFT MODERNIZATION
LIFT MODERNIZATION

NOVA ELEVATOR - MODERNIZATION - SPECIALIST


  • WHO

    Nova specializes in elevator upgrades and modernization. Whether you're looking to make a few cosmetic changes or you want to completely strip out and replace the elevator interior and/or equipment, Nova can perform your elevator upgrades or modernization. What's more, we can usually do the job at a much lower cost than our competitors!

    Based on a full inspection of your elevator equipment, Nova will develop a detailed analysis and recommendations for what you should include in your modernization project. Having managed more than 11000 modernization projects, you can be assured we have the knowledge and experience to perform the job on time and within budget.


  • WHY

    ●  To improve the safety of your elevator

    ●  Increse elevator operational efficiency and performance

    ●  Improve the appearance of your elevators

    ●  Add passenger comfort

    ●  Extend the life of your equipment to help you get more from your initial investmen


  • HOW

    01  Old elevator investigation

    02  Make up modernization plan

    03  Production & QC Inspection

    04  Commissioning & Testing the electrical system in testing center

    05  Delivery & Installation

    06  After-sales Service


For detailed information, please see below Details!

According to different projects' situations, Nova can provide complete modernization solutions which cover from design, manufacture, delivery to guidance for customers' installation and debugging. Comprehensive support can be supplied through the whole process of modernization. The following mechanical and electrical parts for customers' modernization can be designed and produced by us.    


ITEMPARTS NAMESPECIFICATION
1Mechanical Parts                

1.1Traction MachineVVVF Geared Machine or PM Gearless Machine
1.2Traction Machine Bed SetMade for the replaced Traction Machine
1.3Deflector SheaveFor above Traction Machine
1.4Over Speed Governor                
Nova Standard
1.5Steel Wire RopeFor above Traction Machine & Speed Governor
1.6VVVF Floor OperatorReplace the existing old door system
1.7Landing Door SystemReplace the existing old door system



2Electrical Parts
2.1Complete Controlling CabinetVWF in Serial or Parallel system, 2.2-37 KW, 220V/380V
2.2Encoder with CableInstalled in the Traction Machine
2.3Car Top BoardInstalled in the Car Top Inspection Box.
2.4Display Board for COP and LOPsInstalled in the COP and LOPs.
2.5Car Instruction BoardInstalled in the COP.
2.6COPYou may visit our website to choose the model you need:
2.7LOPs or Hopshttp://www.novaelevator.com/trade/6-COP-LOP.html
2.8Car Top Inspection BoxNOVA Standard
2.9Pit BoxNOVA Standard
2.10Leveling Photoelectric SwitchDC24V Normally Open
2.11Limit SwitchNormally Close
2.12All Cable
2.12.1Travelling CableForm Control Cabinet to Car top Inspection Box.
2.12.2Round Shaft CableFrom Control Cabinet to Limit Switches.
2.12.3Round Shaft CableFrom Control Cabinet to Pit Switch
2.12.4Landing Door Lock CableFrom Control Cabinet to Landing Door Locks.
2.12.5LOP Communication CableFrom Control Cabinet to LOPs.
2.12.6Car Top Branch CablesFrom Car Top Inspection Box to COP, Door Operator, Light Curtain etc.



3Other Optional Parts
3.1Group Controlling BoardFor 3-8 units lift
3.2PC Monitoring BoardQuarter Monitoring
3.3ARDMatch to Control Cabinet
3.4UPSEmergency Power for Brake
3.5Access Control SystemInstalled in the COP and LOPs.
3.6Voice AnnouncementBroadcast to the floor information
3.7Fireman SwitchFor Run-Through door
3.8Fan
3.9Light Curtain

The above description is mainly aimed at elevator electrical system and related parts. Both mechanical and electrical modernization solutions can be made by NOVA based on customers' different requirements. Our modernization for your projects will make elevators' performance more excellent.    

COPYRIGHT © NOVA ELEVATOR PARTS CO.,LTD